NPI services: EVT, DVT and PVT with the team that designed it
New product introduction is the stretch from a working design to a product the line can repeat. Engineered in San Francisco. Prototype builds, DFM and mass production in our own factory in Shenzhen.
ISO 9001 · ISO 13485 · IATF 16949 · AS9100 · ISO 14001 (Shenzhen factory) · RoHS and REACH · IPC-A-610 and IPC-6012 Class 3 on request, agreed in the official quote

- Free engineering review
- 500+ projects delivered
- 8 automated SMT lines
- 30+ ICT/FCT test stations
What are EVT, DVT and PVT?
They are the three validation builds between a demo build and volume. EVT asks whether the electronics and mechanics work together. DVT asks whether the product meets its specification under stress and starts the certification path. PVT asks whether the line can build it at rate. After DVT and PVT you sign the golden sample.
| Build | The question it answers | What you receive |
|---|---|---|
| DFM review | Can the factory build, test and source this design? | Findings report sorted by fix stage, changed files |
| Demo build | Does the idea work in a unit you can hold? | Working units for investors, pilots or a launch film |
| EVT | Does the design work as drawn? | EVT units, test results, updated files |
| DVT | Does it meet the specification? | DVT units, validation report, units for the certification path |
| PVT | Can the line repeat it? | PVT units, test plan, fixture definitions |
| Golden sample | What must every unit match? | Sign-off record kept by both parties |
| Production | Does each batch match it? | Batch inspection and test results |
The full picture of how a design reaches volume sits on hardware engineering. For the move itself, read transfer to production, and for the signed reference, what a golden sample is.
Why run NPI with one team?
Because every hand-off between a design firm, a board house and an assembler resets the learning. Our U.S. engineers write the design, and the same engineers attend the EVT, DVT and PVT builds in Shenzhen. Electronics, mechanics, assembly and test sit with one company, so the learning stays in one place.
- U.S. engineers, Shenzhen builds. Direct contact in U.S. hours; the builds run where the parts and lines are.
- One team owns each problem. Boards, enclosures, assembly and test run in the Shenzhen factory, with the engineers who drew the design.
- NDA first. We sign your NDA before the first call, and project files live in private project storage.
- Prototype quantities. Portal services take small lots, so EVT does not wait for a volume order.
- One project record. Files, revisions and prices stay tied together in your portal account.
What do the NPI services cover?
PCB manufacturing. Rigid, flex and rigid-flex boards, from thin flex inside smart glasses to dense HDI for industrial systems. Every board gets an electrical test and AOI before it ships.
Component sourcing. Full turnkey, partial turnkey or consigned parts, drawn from authorized distributors or the original manufacturer and inspected on receipt.
PCB assembly. 01005 parts, BGA and QFN on 8 automated SMT lines, inspected to IPC-A-610 Class 3 on request, agreed in the official quote.
Injection molding. Prototype and production molds, with production steel cut after DVT closes the design.
Box build and assembly. Mechanical assembly, harnesses, firmware loading and final test on fixtures built for your product.
QA and testing. AOI, ICT and functional test, with X-ray on the advanced route and firmware test results kept per serial number.
How is quality held from first article to volume?
With a reference and a record. The first article is approved before volume starts. The golden sample signed after DVT and PVT is the standard each batch is compared with. PCBAs pass AOI, with X-ray on the advanced route, traceability runs from component lot to finished goods, and an engineer reviews any drift before the next batch.
Production units ship with debug ports locked. For the full system, see quality and certificates.
From design to production in four steps
Step 1: Engineering review and DFM. The free engineering review checks your Gerber files, BOM and drawings for the route you ordered, before payment. A DFM review of the whole product is design work: it looks at trace width, placement conflicts, part choice and cost, and returns a findings report sorted by when each fix must happen. See DFM services. You receive a Gerber, BOM and drawing check; placement and trace analysis; cost-reduction suggestions in the findings.
Step 2: Sourcing and procurement. We source from a network of 350 audited suppliers, in full turnkey, partial turnkey or consigned models. Parts are inspected on receipt, checked for counterfeits with X-ray and XRF on the advanced route, and traced by lot.
Step 3: Prototypes and pilot run. We build your EVT and DVT units on the schedule in your official quote. After your approval, a pilot run sized for process validation settles the assembly process and the fixtures. Production test fixtures are ready before PVT. You receive a first article inspection report, with IPC-A-610 Class 3 inspection on request, agreed in the official quote.
Step 4: Production and QA. With the process validated and the golden sample signed, volume begins. Units go through AOI, ICT and FCT, with X-ray on the advanced route, and the ICT and FCT stations run the production test firmware. You receive SPC data, Cpk analysis and traceability, with microsection analysis on request.
The detailed explainer of NPI work sits on NPI engineering. For first units in days, the portal takes 72-hour prototype builds.
PCB specifications for NPI builds
We fabricate the boards in the Shenzhen factory. IPC-6012 Class 3 and IPC-A-610 Class 3 are available on request, agreed in the official quote.
Surface finishes. ENIG, lead-free HASL, OSP, immersion silver, immersion tin and hard gold for edge connectors.
Special processes. Blind and buried vias, controlled-depth routing, countersink and counterbore, peelable solder mask, carbon ink, conductive epoxy fill and embedded resistors. High-Tg and heavy-copper builds are supported. Part finishes and special processes include plating, painting, laser marking and conformal coating.
| Specification | Range |
|---|---|
| Layer count | Up to 30 layers in the configurator, 40 layers through review |
| Board thickness | Up to 3.2 mm, ±10 % tolerance |
| Minimum trace and space | 3 mil standard, 2.5 mil HDI, 2 mil advanced |
| Minimum hole size | 0.15 mm, mechanical drill |
| Laser microvias | 0.1 mm and up |
| Copper weight | 1 to 6 oz in the configurator, 0.5 to 20 oz through review |
| Maximum board size | 600 mm per side in the configurator, 610 x 914 mm through review |
| Outline tolerance | ±0.15 mm, V-cut and routing |
| Average hole copper | 20 µm or more |
| Smallest part and BGA pitch | 01005 (0.4 x 0.2 mm), 0.25 mm BGA pitch |
Who we work with
Trusted by 200+ hardware teams across 30 countries: startups, product teams and R&D groups. Fields include industrial IoT, medical devices, robotics, automotive and EV parts, aerospace and drones, consumer products, power and energy, instruments, smart home and telecom.
Recent NPI work
Printed shells that could not pass the certification path. A smart-home controller startup moved from 3D-printed EVT shells to die-cast and overmolded enclosures with an HDI board, under one NPI program. Read the case study.
An EV battery controller that needed automotive records. A BMS controller moved to an IATF 16949 line with PPAP documentation and AEC-Q200 parts. Read the case study.
An actuator split across three vendors. A humanoid robotics team brought machining, motor-drive boards and actuator assembly into one program with end-of-line testing. Read the case study.
Questions about NPI builds
What files do I need to start?
For bare boards, Gerber and drill files. For assembly, a BOM in Excel or CSV, pick-and-place files and any special instructions. For mechanical parts, STEP or SolidWorks files. If you only have a sketch or a dev-kit prototype, start with project initiation instead.
What is your typical lead time?
The lead time is stated in the official quote published after the free engineering review, not before it. It depends on the board, the BOM and the queue. A shorter schedule can be quoted for your configuration, and you see that line before you commit.
Do you have minimum order quantities?
No minimum for NPI builds: portal services take prototype quantities. Orders run from one-piece prototypes to 10,000+ production runs, and the quantity and price breaks are set in the official quote. Repeat orders carry no new setup fee unless the design changes.
What if I need design help?
Our engineers design the electronics, the enclosure and the firmware, then hand the same files to the NPI builds. That keeps one team on the product from the first schematic to PVT. Start with product design or ask an engineer directly.
Still have questions?
Ask our engineering team directly. An engineer answers, not a bot.
Start your NPI project
Tell us about your project. An engineer reads your requirements and replies once they have read them. The free engineering review comes before payment.
- Free engineering review. An engineer reads your files before you pay.
- IPC-A-610 Class 3. Available on request, agreed in the official quote.
- One prototype to volume. The same team carries the product into production.